Malabar Resources

2017 Report – Not submitted1 2016 Report – Not submitted1 Note: [1] Anglo American had limited involvement in the project by providing data for the 2016 project, however did not provide a 2016 report against the rehabilitation principles, as they were no longer members of the NSW Minerals Council or the Upper Hunter Mining Dialogue.Learn more Malabar Resources

Yancoal

2018 Report – Not submitted Note: [1] Yancoal acquired control of Coal & Allied assets in 2017. Ashton Coal Operations and MTW are now reported in Yancoal’s total results. Yancoal entered into a joint venture with Glencore in relation to the HVO site, with reporting for HVO now included under Glencore’s total results. Ashton CoalLearn more Yancoal

Glencore

Note: [1] The Integra site is no longer operated by Vale. In October 2015, The Bloomfield Group and Glencore assumed operation of these sites and rehabilitation results from these respective sites are contained in either the The Bloomfield Group or Glencore reporting documents from 2015 onwards.

The Bloomfield Group

Note: [1] The Integra site is no longer operated by Vale. In October 2015, The Bloomfield Group and Glencore assumed operation of these sites and rehabilitation results from these respective sites are contained in either the The Bloomfield Group or Glencore reporting documents from 2015 onwards.

BHP

2014 Report – Not submitted

Bengalla Mining Company

2021 Report – Not submitted, however data was provided 2019 Report – Not submitted, however data was provided 2016 Report – Not submitted, however data was provided1 Note: [1] The Bengalla Mining Company commenced operation of the Bengalla site formerly owned by Coal & Allied in September 2015. Bengalla participated in the 2016 project inLearn more Bengalla Mining Company