Note: [1] The Integra site is no longer operated by Vale. In October 2015, The Bloomfield Group and Glencore assumed operation of these sites and rehabilitation results from these respective sites are contained in either the The Bloomfield Group or Glencore reporting documents from 2015 onwards.